Paul Hardin Drive
Purpose of Improvements
This connection would improve north-south connectivity between residence halls and the Kenan Stadium East and West Path system.
Existing Conditions
- Road width varies from 20-foot lanes (2 lanes) to 36-foot lanes (3 lanes).
- There are no existing bicycle accommodations.
- There are 5 to 10-foot wide sidewalks on both sides.
- The steep grade northbound is a significant barrier for bicyclists.
- The roadway is maintained by UNC-CH.
Short-Term Recommendation
Shared Lane Markings
Add shared lane markings in the center of the outside lanes with BICYCLES MAY USE FULL LANE signs.
Primary Implementation Challenges: none
Probable Construction Cost: $2,895
Long-Term Recommendation Options
Further study will be required to select one of the following options.
Shared Use Path
When the DPS Building site is redeveloped, construct a 12-16 foot wide shared use path along the east side of Paul Hardin Drive to connect Ram Village, Kenan Stadium East and West Paths.
Primary Implementation Challenges: west side of Paul Hardin Drive along the Craige Deck is constrained by existing retaining walls and steep slopes. May require relocation or construction of retaining walls.
Probable Construction Cost: $206,565
Bicycle Lanes
As part of a roadway widening or reconstruction project, add 6-foot bicycle lanes to both sides of the roadway.
Primary Implementation Challenges: West side of Paul Hardin Drive along the Craige Deck is constrained by existing retaining walls and steep slopes. May require relocation or construction of retaining walls.
Probable Construction Cost: $598,515